Project implementation period: 2009
Construction facilities:
Gas Turbine Power Plant, Low pressure water pipe, inside cluster lines of wells, roads, high pressure oil pipeline. Facilities located in Kamennaya Ploshchad in Krasnoleninskiy Gas and Oil Condensate Field. Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).
Services rendered:
- Maintaining construction supervision at the facilities under construction, reconstruction or rebuilding;
- Controlling the compliance with HSE standards at construction facilities.