29B, Klary Tsetkin st.
Perm. RF.
Рус    Eng
info@cskperm.ru 007 (342) 215 19 19
Projects / Industrial construction / OJSC Slavneft-Megionneftegaz

OJSC Slavneft-Megionneftegaz


Project implementation period: 2013 - 2014

Construction facilities:

Gas turbine electric power station 36 MW; Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).

Services rendered:

  • Maintaining construction supervision at the facilities under construction, reconstruction or rebuilding;
  • Controlling the compliance with HSE standards at the construction facilities;
  • Developing construction projects network schedules.