Industrial construction
Services for monitoring the processes of construction control over contractors during the construction of mining and processing facilities at the Kumroch deposit in the Ust-Kamchatsky municipal district of the Kamchatka Territory 2022
Implementation of construction control over construction, reconstruction, modernization, additional equipment and technical re-equipment and overhaul 2022-2023
Implementation of construction control at the facility: “Technical re-equipment of the hazardous production facility “Hazardous Substances Transportation Section (Omsk Oil Products Shipping Center) in terms of introducing a microprocessor-based centralization system 2019-2023
Construction of a new workshop for preparation of the tree
Oil-gathering networks, High-pressure conduit, Improvement of a bush of wells, Gas pipeline, Communication systems, Motorway to a bush of wells, Storage platform chemical reagents, Technological communications
Installation and preparation of the Ichhedinskoye oil field
Complex of reception, storage and shipment of liquefied hydrocarbon gases in Irkutsk region
Pilot crushing- sorting unit at Ulu-Teliakskoie field.
Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).
Main pipelines "Kuyumba-Tayshet", "Krasnoyarsk-Irkutsk", "Omsk-Irkutsk";
Infrastructure facilities of Vostoknefteprovod LLC;
Increasing capacity of pipelines: "Skovorodino-Mokhe", "Vostochnaya Sibir-Tikhiy Okean", "VSTO-2".
.
Petroleum, oil and lubricants storehouse on the project: "Construction of take-off runway in Palana village, Kamchatka Krai"
Finished products storage area;
Production and storage building;
The area of house trailer camp;
Reconstruction of buildings №9.2 and №17 into united production shop.
Central Engineering and Technical Office "Polazna";
Central Engineering and Technical Office "Osa";
Central Engineering and Technical Office "Chernushka".
Oil production sites, line oil pipes, power facilities, access roads, crude oil receiving station, fuel and lubricant storage station, development of an oil production site.
Gas pipe line "Varyeganskaya Compressor Station – Vyngapurovskaya Gas Processing Plant".
Power Unit № 3 of PSU-800 in Berezovskaya GRES power plant.
Gas turbine electric power station 36 MW; Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).
Main product pipeline “Gubkinskiy Gas Treatment Complex- Railroad Loading Facility for WLHF (wide light hydrocarbon fraction)”.
Main product pipeline “Gubkinskiy Gas Treatment Plant- Nizhnevartovskiy Gas Treatment Plant-Uzhno-Balikskiy Gas Treatment Plant- Tobolskiy Petrochemical Plant”.
Start-up complex “Gubkinskiy Gas Treatment Complex – Muravlenkovskiy Gas Treatment Plant”.
Railroad Loading Facility for WLHF (wide light hydrocarbon fraction) with LPG Storage.
Compression and gas transportation plant of Tyumen compressor station.
Administrative complex for Tyumen compressor station.
Oil production, treatment and transportation facilities for OJSC RITEK.
Petrol Station located on the highway Moscow-Minsk in Smolenskiy region of Safronovskiy district.
Gas recovery System at “Kurbaty-Churaki” pipeline;
Natural Gas Purification Plant of Kokuiskoye field;
Gas Compressor Station “Unva”;
Gas Compressor Station “Kamenny log”;
Circulating Water Supply Unit № 1,2.
PVC Producing Plant with the capacity of 300 thousand tons per year.
Complex for the production of nanostructured membrane fabric, membrane elements (tubular, flat-plate and roll ones) for reverse osmosis, nanofiltration, ultrafiltration, microfiltration and membrane bioreactors.
Combined Cycle Gas Turbine Unit 120 MW at Perm Combined Heat and Power Station-6 (CHP-6)
Combined Heat and Power Station (CHP) with the capacity of 150 MW in Lipetsk town.
Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).
Facilities located in Kamennaya Ploshchad in Krasnoleninskiy Gas and Oil Condensate Field. Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit ,Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).
Gas Turbine Power Plant, Low pressure water pipe, inside cluster lines of wells, roads, high pressure oil pipeline.
Multifunctional petrol stations (14 MPS)
Base of structures and roads, pipelines, site facilities, power facilities, Gas turbine Power plant.
Associated Petroleum Gas Treatment Plant for Priobsky and Prirazlomny oil field with the capacity of 1.84 milliard m3/year.
Multiple-well platforms, line oil pipes, power facilities, water wells, access roads, Cluster Pump Station, sludge pits.
Oil production facilities, oil processing and transportation facilities (Cluster oil wells, Oil treatment facility, Central Production Facility, Oil/Gas accumulation areas, Central Oil Gas Accumulation Station, Preliminary water removal unit, Booster pipeline pumping station, Oil pumping station, Oil processing and pumping unit, Gas and oil transportation pipelines, Water pipes, Electrical power facilities, Roads).